Substation, Its Function And Types

Substation, Its Function And Types

An electrical sub-station is an assemblage of electrical components including busbars, switchgear, power transformers, auxiliaries etc.

These components are connected in a definite sequence such that a circuit can be switched off during normal operation by manual command and also automatically during abnormal conditions such as short-circuit. Basically an electrical substation consists of No. of incoming circuits and outgoing circuits connected to a common Bus-bar systems. A substation receives electrical power from generating station via incoming transmission lines and delivers elect. power via the outgoing transmission lines.

Sub-station are integral parts of a power system and form important links between the generating station, transmission systems, distribution systems and the load points.

MAIN TASKS

…Associated with major sub-stations in the transmission and distribution system include the following:

  1. Protection of transmission system.
  2. Controlling the Exchange of Energy.
  3. Ensure steady State & Transient stability.
  4. Load shedding and prevention of loss of synchronism. Maintaining the system frequency within targeted limits.
  5. Voltage Control; reducing the reactive power flow by compensation of reactive power, tap-changing.
  6. Securing the supply by proving adequate line capacity.
  7. Data transmission via power line carrier for the purpose of network monitoring; control and protection.
  8. Fault analysis and pin-pointing the cause and subsequent improvement in that area of field.
  9. Determining the energy transfer through transmission lines.
  10. Reliable supply by feeding the network at various points.
  11. Establishment of economic load distribution and several associated functions.

TYPES OF SUBSTATION

The substations can be classified in several ways including the following :

  1. Classification based on voltage levels, e.g. : A.C. Substation : EHV, HV, MV, LV; HVDC Substation.
  2. Classification based on Outdoor or Indoor : Outdor substation is under open skv. Indoor substation is inside a building.
  3. Classification based on configuration, e.g. :
    • Conventional air insulated outdoor substation or
    • SF6 Gas Insulated Substation (GIS)
    • Composite substations having combination of the above two
  4. Classification based on application
    • Step Up Substation : Associated with generating station as the generating voltage is low.
    • Primary Grid Substation : Created at suitable load centre along Primary transmission lines.
    • Secondary Substation : Along Secondary Transmission Line.
    • Distribution Substation : Created where the transmission line voltage is Step Down to supply voltage.
    • Bulk supply and industrial substation : Similar to distribution sub-station but created separately for each consumer.
    • Mining Substation : Needs special design consideration because of extra precaution for safety needed in the operation of electric supply.
    • Mobile Substation : Temporary requirement.
      NOTE :
    • Primary Substations receive power from EHV lines at 400KV, 220KV, 132KV and transform the voltage to 66KV, 33KV or 22KV (22KV is uncommon) to suit the local requirements in respect of both load and distance of ultimate consumers. These are also referred to ‘EHV’ Substations.
    • Secondary Substations receive power at 66/33KV which is stepped down usually to 11KV.
    • Distribution Substations receive power at 11KV, 6.6 KV and step down to a volt suitable for LV distribution purposes, normally at 415 volts

SUBSTATION PARTS AND EQUIPMENTS

Each sub-station has the following parts and equipment.

  1. Outdoor Switchyard
    • Incoming Lines
    • Outgoing Lines
    • Bus bar
    • Transformers
    • Bus post insulator & string insulators
    • Substation Equipment such as Circuit-beakers, Isolators, Earthing Switches, Surge Arresters, CTs, VTs, Neutral Grounding equipment.
    • Station Earthing system comprising ground mat, risers, auxiliary mat, earthing strips, earthing spikes & earth electrodes.
    • Overhead earthwire shielding against lightening strokes.
    • Galvanised steel structures for towers, gantries, equipment supports.
    • PLCC equipment including line trap, tuning unit, coupling capacitor, etc.
    • Power cables
    • Control cables for protection and control
    • Roads, Railway track, cable trenches
    • Station illumination system
  2. Main Office Building
    • Administrative building
    • Conference room etc.
  3. 6/10/11/20/35 KV Switchgear, LV
    • Indoor Switchgear
  4. Switchgear and Control Panel Building
    • Low voltage a.c. Switchgear
    • Control Panels, Protection Panels
  5. Battery Room and D.C. Distribution System
    • D.C. Battery system and charging equipment
    • D.C. distribution system
  6. Mechanical, Electrical and Other Auxiliaries
    • Fire fighting system
    • D.G. Set
    • Oil purification system

An important function performed by a substation is switching, which is the connecting and disconnecting of transmission lines or other components to and from the system. Switching events may be “planned” or “unplanned”. A transmission line or other component may need to be deenergized for maintenance or for new construction; for example, adding or removing a transmission line or a transformer. To maintain reliability of supply, no company ever brings down its whole system for maintenance. All work to be performed, from routine testing to adding entirely new substations, must be done while keeping the whole system running.

Perhaps more importantly, a fault may develop in a transmission line or any other component. Some examples of this: a line is hit by lightning and develops an arc, or a tower is blown down by a high wind. The function of the substation is to isolate the faulted portion of the system in the shortest possible time.

There are two main reasons: a fault tends to cause equipment damage; and it tends to destabilize the whole system. For example, a transmission line left in a faulted condition will eventually burn down, and similarly, a transformer left in a faulted condition will eventually blow up. While these are happening, the power drain makes the system more unstable. Disconnecting the faulted component, quickly, tends to minimize both of these problems.

.

Related articles

The Unique Role Of Wind Turbine WTSU

The Unique Role Of Wind Turbine WTSU

Harnessing wind energy to perform work is not a new concept. Since the earliest of times, wind power has been captured with sails to allow traders, merchants and explorers to ply their trades and discover the world around them. On land, windmills have been used for irrigation, grinding grains, and performing crude manufacturing for centuries. Even the generation of electricity from wind power is not a new idea. What is new, however, is the scale at which this renewable energy source is being used today.

Early wind generation served a local need, often supplying power for isolated equipment. Today, wind energy represents nearly 5% of the US electrical generation and is targeted to reach 20% in the foreseeable future.
For this to happen, wind turbine outputs need to be gathered, stepped-up to transmission levels and passed across the nation’s interconnected power grid to the end users. The role of the Wind Turbine Step-Up (WTSU) transformer in this process is critical and, as such, its design needs to be carefully and thoughtfully analyzed and reevaluated in our view.

Historically this WTSU transformer function has been handled by conventional, “off the shelf” distribution transformers, but the relatively large numbers of recent failures would strongly suggest that WTSU transformer designs need to be made substantially more robust. WTSU transformers are neither conventional “off the shelf” distribution transformers nor are they conventional “off the shelf” power generator step-up transformers. WTSU transformers fall somewhere in between and as such, we believe, require a unique design standard.
Although off-shore wind farms using dry-type transformers are beginning to grow in popularity, for this discussion we will look only at liquid-filled transformers that are normally associated with inland wind farm sites.

Transformer Loading

Wind turbine output voltages typically range from 480 volts to 690 volts. This turbine output is then delivered to the WTSU transformers and transformed to a collector voltage of 13,800 to 46,000 volts. The turbines are highly dependant upon local climatic conditions; and this dependency can result in yearly average load factor as low as 35%. Both conventional distribution transformers and power generator step-up transformers are typically subjected to more constant loading at, or slightly above, their theoretical maximum rating. This high level of loading stresses insulation thermally and leads to reduced insulation life. On the other hand, the relatively light loading of WTSU transformer has a favorable effect on insulation life but introduces two unique and functionally significant problems with which other types of conventional transformers do not have to deal.

The first problem is that, when lightly loaded or idle, the core losses become a more significant economic factor while the coil or winding losses become less significant and de-emphasized. Typically used price evaluation formulae do not apply to this scenario. NEMA TP1 and DOE efficiencies are not modeled for the operational scenario where average loading is near 30-35% and, consequently, should be cautiously applied when calculating the total cost of ownership for WTSU transformers.

The second problem is that the WTSU transformer goes into thermal cycling as a function of these varying loads. This causes repeated thermal stress on the winding, clamping structure, seals and gaskets. Repeated thermal cycling causes nitrogen gas to be absorbed into the hot oil and then released as the oil cools, forming bubbles within the oil which can migrate into the insulation and windings to create hot spots and partial discharges which can damage insulation. The thermal cycling can also cause accelerated aging of internal and external electrical connections.
These cumulative effects put the WTSU transformer at a higher risk of insulation and dielectric failure than either the typical “off the shelf” distribution transformer or the power generator step-up transformer experiences.

Harmonics and Non-Sinusoidal loads:

Another unique aspect of WTSU transformers is the fact that they are switched in the line with solid state controls to limit the inrush currents. This differs widely from the typical step-up transformer which must be designed to withstand high magnetizing inrush currents which cause core saturation, and in the extreme Ferroresonance.

While potentially aiding in the initial energization, these same electronic controls contribute damaging harmonic voltage frequencies that, when coupled with the non- sinusoidal wave forms from the wind turbines, cannot be ignored from a heating point of view. Conventional distribution transformers do not typically see non-linear loads that require preventative steps due to harmonic loading. When a rectifier/chopper system is used, the WTSU transformer must be designed for harmonics similar to rectifier transformers, taking the additional loading into consideration as well as providing electrostatic shields to prevent the transfer of harmonic frequencies between the primary and secondary windings, quite dissimilar to conventional distribution transformers.

Transformer sizing and voltage variation

WTSU transformers are designed such that the voltage is matched to the generator (e.g. wind turbine) output voltage exactly. There is no “designed in” over-voltage capacity to overcome voltage fluctuations, as is typically done on distribution and power transformer designs which allow for up to 10% over-voltage. Further, it should be noted that the generator output current is monitored at millisecond intervals and the generator limited to allow up to 5% over-current for 10 seconds before it is taken off the system. Therefore, the WTSU transformer size ( kVA or MVA) is designed to match the generator output with no overload sizing. Since overload sizing is a common protective practice with “off the shelf” distribution or power step-up generator transformers, the WTSU transformer design must be uniquely robust to function without it.

Requirement to withstand Fault Currents

Typically, conventional distribution transformers, power transformers, and other types of step-up transformers will “drop out” when subjected to an under-voltage or over- current situation caused by a fault. Once the fault has cleared, the distribution transformer is brought back on-line either individually or with it’s local feeder in conjunction with automatic reclosures. Wind turbine generators, on the other hand, in order to maintain network stability are only allowed to disconnect from the system due to network disturbances within certain, carefully controlled network guidelines developed for generating plants.

Depending upon the specific network regulations, the length of time the generator is required to stay on line can vary. During this time the generator will continue to deliver an abnormally low voltage to the WTSU transformer. Therefore, during near-to generator faults, the generator may be required to carry as low as 15% rated voltage for a few cycles and then ramp back up to full volts a few seconds after fault clearing. This means that the WTSU transformer must be uniquely designed with enough “ruggedness” to withstand full short circuit current during the initial few cycles when the maximum mechanical forces are exerted upon the WTSU transformer windings.

Since wind turbines must stay connected during disturbances in the network, the WTSU transformers must be designed to withstand the full mechanical effects of short circuits.

Conclusions

The role of WTSU transformers in today’s wind generation scheme is unique; it’s design must be equally unique and robust. The combination of wide variations in loading; harmonic loads from associated control electronics and generators; sizing without protection for over-voltages, under-voltages or over-loading; and the requirement to “ride through” transient events and faults sets the WTSU apart from it’s more conventional, “off the shelf” counterparts. It is neither a conventional distribution transformer nor is it a conventional generator step-up transformer.

“Off the shelf” . . . doesn’t belong . . . “down on the farm”!
.

AUTHOR: Pacific Crest Transformers
.